Yes! We have to build our classroom.

Yes!  We have to build our classroom.

Sunday, September 7, 2014

Place concrete in the crawl space.


The concrete had to be pushed and pulled to make it fit.



Sometimes we had too much help.


And then students begin finishing while it was still wet.


This is the last student on the last area to be finished. 

Footing Drain...Radon Reduction System


A four inch pipe is placed around the footings.


A stand pipe is installed in case future access is necessary.



Fabric is placed over the drain pipe to keep it from filling with dirt. 


Damp proof the foundation


Tar the holes


Roll the sealant.  NOTE: This does not wash off clothes.